Engineering Company

DAMS


TITLE: IMPOUNDING RESERVOIR ACROSS INGAGNA TORRENT
DESCRIPTION: final engineering design and survey for a reservoir and a dam across Ingagna torrent with a capacity of 8.0 millions cubic metres for agricultural, drinking and hydro-electric power purposes.
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 100.000.000,00
YEAR: 1993

TITLE: IMPOUNDING RESERVOIR ACROSS OSTOLA TORRENT
DESCRIPTION: final engineering design, construction management and final inspection for a reservoir and a dam across Ostola torrent with a capacity of 5.5 millions cubic metres for agricultural, drinking and hydro-electric power purposes.
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 70.000.000,00
YEAR: 1980

TITLE: IMPOUNDING RESERVOIR ACROSS RAVASANELLA TORRENT
DESCRIPTION: final engineering design, construction management and final inspection for a reservoir and a dam across Ravasanella torrent with a total capacity of 5,3 millions cubic metres for agricultural, drinking and hydro-electric power purposes.
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 80.000.000,00
YEAR: 1994

TITLE: NEW IMPOUNDING RESERVOIR AND DAM ACROSS SESSERA TORRENT
DESCRIPTION: engineering design for a new dam as high as about 80 metres with a storage capacity of 7.200.000 cubic metres; the impounded water will be used for irrigation, drinking and hydroelectric power purposes.
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 170.000.000,00
YEAR: 2007

TITLE: FEASIBILITY STUDY FOR A NEW ARCH-GRAVITY DAM ACROSS MASTALLONE TORRENT AIMING AT IMPROVING THE EFFICIENCY OF WATER DIVERSION FOR IRRIGATION PURPOSES BOTH ON RIGHT AND LEFT BANKS OF SESIA RIVER
DESCRIPTION: the dam object of study across Mastallone torrent is an arch-gravity type dam as high as 80 meters , with a top crown as long as 200 metres and a storage capacity of about 13.500.000,00 cubic metres intended for irrigation, drinking and hydro-electric power purposes.
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORK: € 280.000.000,00
YEAR: 2007

TITLE: DIVERSION AND REGULATION WEIR ACROSS SESIA RIVER IN THE MUNICIPALITY OF GATTINARA AND ROMAGNANO SESIA
DESCRIPTION: final engineering design for a weir as long as 175 metres across the active bed of Sesia river; the diversion weir across the bed of Sesia river has been designed to divert a portion of flow enabling to irrigate a cultivated area of about 13.000 ha.
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 22.500.000,00
YEAR: 2004

TITLE: TUNNEL FOR THE CONDUCTION OF WATER FLOW DIVERTED FROM ELVO TORRENT
DESCRIPTION: the final engineering design consists in the diversion of a portion of flow from Elvo torrent and its conduction to the nearby artificial reservoir across Ingagna torrent. Canalization of water will be provided through a tunnel constructed partially with the traditional tecnique (800 metres) and partially through microtunnelling with Slurry Shield technology (660 metres).
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 16.700.000,00
YEAR: 2007