Engineering Company

IRRIGATION


TITLE: CONSTRUCTION OF THE IRRIGATION PIPELINES NETWORK CONNECTED WITH THE IMPOUNDING RESERVOIR ACROSS RAVASANELLA TORRENT
DESCRIPTION: the final engineering design consists in the functional completion of the irrigation pipelines network connected with the impounding reservoir across Ravasanella river. The aim of this project is to enable to provide a rational distribution of water to all entitled areas. Works consist in laying down about 12.980 linear metres of concrete irrigation channels.
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 2.100.000,00
YEAR: 2002 and 2005

TITLE: WORKS FOR THE ENHANCEMENT AND RESTORATION OF MARCHIONALE AND BONINO CHANNELS
DESCRIPTION: the final engineering design consists in the revetment of Marchionale and Bonino artificial channels having both a flow rateof cubic metres/sec.
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 23.200.000,00
YEAR: 2004 – 2008

TITLE: WORKS FOR THE ENHANCEMENT AND RESTORATION OF FIAT E RAMO DEL PALLONE CHANNELS
DESCRIPTION: the final engineering design consists in the revetment of Fiat and Pallone artificial channels and in the maintenance and enhancement of all irrigation facilities constructed along them.
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 11.000.000,00
YEAR: 2004 – 2007

TITLE: NUOVO CANALE DELLA BARAGGIA CHANNEL
DESCRIPTION: the final engineering design consists in the construction of a new artificial channel featuring concrete bed and earth banks as long as 3.300,00 linear metres; also consists in the construction of hydraulic regulation and interconnecting structures along its course.
CUSTOMER: Consorzio di Bonifica della Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 14.200.000,00
YEAR: 2001 – 2005

TITLE: NEW DRAINAGE CHANNEL IN TRINO VERCELLESE
DESCRIPTION: final engineering design develops a new artificial channel in Trino Vercellese as long as 4.500,00 metres constructed mainly through natural engineering techniques. Hydraulic regulation machinary and interconnecting facilities along its course are also provided for. The purpose of these works is overcoming the critical peaks caused by floods in Po river.
CUSTOMER: Associazione di Irrigazione Ovest Sesia – (Italy)
TOTAL AMOUNT OF WORKS: € 9.000.000,00
YEAR: 2008

TITLE: SPRINKLER IRRIGATION SYSTEM FED WITH WATER FROM THE RESERVOIR ACROSS INGAGNA TORRENT
DESCRIPTION: final engineering design consists in the construction of a sprinkler irrigation system performing over a total farming area of 3.900,00 ha.
CUSTOMER: Consorzio di Bonifica della
Baraggia Biellese e Vercellese – (Italy)
TOTAL AMOUNT OF WORKS: € 136.000.000,00
YEAR: 2001 – 2008